Presentation to City of Beaverton Transportation Commission
Working Paper 1
Documentation of the Engineering Assessment (132KB)
Working Paper 2
Documentation of the Agency Survey (126KB)
Working Paper 3
Documentation of the Driver Survey (1,278KB)
Working Paper 4
Documentation of the Traffic Operations Studies (145KB)
Working Paper 5
Documentation of the Conflict Studies (138KB)
Working Paper 6
Documentation of the Crash Analysis (191KB)
Working
Paper 7
Documentation of Driver Confirmation Study (3,040KB)
Working Paper
8
Documentation of Implementation Study (31,708KB)
Interim Report
Interim Report to NCHRP (771KB)
IMPLEMENTATION REQUEST FORMS/INFORMATION
(Note: Word and PDF format available)
Sample FHWA Implementation Request
Sample Request (155KB)
Flashing Yellow Field
Implementation Plan August, 2000
Documentation of Field Implementation Process (267KB)
Sample FHWA Implementation Request
Sample Request (Word File: 146KB)
Flashing Yellow Field
Implementation Plan August, 2000
Documentation of Field Implementation Process (Word File: 1,565KB)
IMPLEMENTATION PLAN WORKSHEETS
Sample Crash and Video Data
Collection Sheets
Sample Forms (Excel File: 52KB)
[Home]
[What is this project about?] [Who is
conducting the research?]
[Current Status]
[PPLT Links]
For comments or questions regarding this web site, please contact Chris Brehmer.
Copyright
2002 by Kittelson & Associates, Inc. All rights reserved.
Reproduction for commercial use in whole or in part without permission is prohibited.